*人交獸AV完整版在线观看,人交獸AV,女人天堂人禽交AV在线观看,欧美人禽杂交AV片

    1. <rp id="he4zc"></rp>
      <button id="he4zc"><object id="he4zc"></object></button>

        1. Data Center Map

          Manitoba Hydro Telecom


          » Index » Canada » Winnipeg » Manitoba Hydro Telecom

          Manitoba Hydro Telecom is located in the area Winnipeg, Canada, and the colocation data center is carrier neutral. The data center was last updated on 15-11-2016.


          Address:
          Manitoba Hydro Telecom
          R3P1A3 Winnipeg
          Manitoba, Canada

          » Request quote
          » Visit website

          Click here to find other data centers
          owned and operated by Manitoba Hydro Telecom.
          * For security reasons this data center does not want its exact location publicly available.
          Therefore the address above is not the exact location, but it is within 360 Portage Ave..


          Profile
          Tenants
          Connectivity
          Request quote
          Office space
          Rack Cabinets
          Dedicated Servers
          Suites
          Footprints
          Virtual Servers
          Cages
          Hosting of individual servers
          Remote Hands

          Profile


          With Manitoba Hydro Telecom (MHT) you can access a stable, robust, and scalable environment for hosting databases, application servers, and file servers to meet your IT needs. MHT leases cabinets (racks) to clients on a monthly basis to colocate equipment.

          The MHT fiber network includes connections to 151 Front St. in Toronto and The Westin Building (Seattle Internet Exchange) in Seattle. You can also connect your equipment to the majority of Manitoba using Transparent LAN Services.

          Features:
          - UPS backup, diesel generators, and standard commercial power.
          - Carrier-neutrality provides you access to major telecommunications carriers.
          - Comprehensive physical security, climate control, fire control, 24/7 monitoring and support.
          - Space and electrical power can be increased as needed.

          Space Available:

          1/4 locked cabinet 20 amp AC/UPS
          1/3 locked cabinet 20 amp AC/UPS
          1/2 locked cabinet 20 amp AC/UPS
          Full locked cabinet 20 amp AC/UPS


          Manitoba Hydro Telecom Pricing/Quotes


          If you are interested in receiving a quote for Manitoba Hydro Telecom, please try our free quote service.

          Copyright © Data Center Map - Sitemap
          Your guide to colocation data centers, managed hosting, cloud servers etc.
          *人交獸AV完整版在线观看,人交獸AV,女人天堂人禽交AV在线观看,欧美人禽杂交AV片

            1. <rp id="he4zc"></rp>
              <button id="he4zc"><object id="he4zc"></object></button>